DETECTION_TIMELINE · SIGNAL_TO_ACQUISITION · 7 EVENTS
How the platform detected what the market missed.
Six signal families converged over 18 months before any public announcement. Click any event to expand source attribution and full detail.
FERC Interconnection Queue Signals
RTMP Tariff Expansion Confirmed
Zoning + Environmental Confirmation
Corridor Detection Event Logged
Acquisition Executed at Standard Pricing
First Hyperscaler Public Announcement
MAI Appraisal: $12.0M
Platform detection confirmed 13 months before public market recognition.
Acquisition at standard industrial pricing ($3.1M) with $0 corridor premium. Comparable assets repriced 3–5× within 90 days of Q4-2023 announcement. Position is documented, operationally verified, and cannot be replicated.
CORRIDOR_GEOGRAPHY · $61B COMMITTED · 55-MILE RADIUS
Five major deployments. One center position.
1509 Rapids Drive sits at the geographic center of a $61B+ investment cluster. Hover any project on the map or list to cross-highlight.
APPROXIMATE POSITIONS · NOT TO SCALE · HOVER TO EXPLORE
COMMITTED INVESTMENT · BILLIONS ANNOUNCED
Hyperscaler Campus
Mount Pleasant · 10 mi SE
$20B
AI Infrastructure
Port Washington · 38 mi N
$18B
Regional Colo Hub
Milwaukee Metro · 30 mi NNW
$12B
Hyperscale Campus
Janesville · 45 mi SSW
$10B
AI/ML Infrastructure
Beaver Dam · 55 mi NW
$1B
CORRIDOR TOTAL
Sum of publicly announced figures¹ · 2023–2025
$61B+1
CORRIDOR_DEMAND_FORECAST · 2025–2029 · MW PROJECTION
Demand trajectory and The Center’s position within it.
Projected to reach 2,000 MW of active demand by 2029. Bars animate on scroll. Hover any year for phase context and B2B deployment target.
2025
450 MW
Phase 1 construction
2026
650 MW
Phase 2 expansion
2027
1,100 MW
Expansion / stabilization
2028
1,500 MW
Scaling / multi-phase
2029
2,000 MW
Exit / permanent financing
Corridor projections based on announced hyperscaler investments and industry estimates. Not a guarantee of future demand. B2B target MW reflects internal phase plan only and does not constitute an investor commitment.
POWER_SAVINGS_CALC · FIVE_MARKET_COMPARISON · OPERATOR_TOOL
What Racine’s power rate is worth to your operation.
Enter your deployment capacity and utilization. The calculator shows annual power cost across five markets and the exact savings captured by operating in the RTMP tariff zone.
39.4M kWh/yr · at 90% utilization
8,760 hr/yr · 39,420 MWh total
MARKET
RATE / KWH
ANNUAL COST
SAVINGS VS. RACINE
Racine, WI (RTMP)
RTMP BASELINE
$0.038
$0.030–$0.046
$1.50M
BASELINEChicago, IL
$0.100
$0.080–$0.120
$3.94M
+$2.44M/yr
Northern VA
$0.075
$0.065–$0.085
$2.96M
+$1.46M/yr
Phoenix, AZ
$0.070
$0.060–$0.080
$2.76M
+$1.26M/yr
Dallas, TX
$0.065
$0.055–$0.075
$2.56M
+$1.06M/yr
At 5 MW · 90% utilization — Racine RTMP saves $2.44M/yr vs. Chicago and $1.46M/yr vs. Northern VA. Power rate is the single largest lever in long-run operator economics.
Rate midpoints used. Racine RTMP: PSCW tariff 5-UR-111 confirmed. Comparator rates are published market estimates and vary by contract structure. Calculator output is illustrative only and does not constitute financial advice.
STRUCTURAL_URGENCY · TIMING_CONTEXT · WHY_NOW
Four structural reasons this window is closing.
The corridor is not a thesis. It is an observable, documented market condition with a finite window for entry at the current basis.
GPU_BACKLOG
GPU Deployment Backlog
NVIDIA H100/H200 orders run 12–18 months out. Operators with sites ready for power and cooling take delivery immediately. Shadow Power assets — existing substations with confirmed headroom — are the critical path between purchase order and first revenue.
Every 30 days without a powered site = another quarter of delayed revenue.
QUEUE_CRISIS
36–72 Month Utility Queue
Standard new utility service applications sit in a 36–72 month interconnection queue. 1509 Rapids Drive bypasses this entirely. WE Energies Form 4158 filed on existing infrastructure. 32+ MW confirmed headroom. No queue. No wait.
New entrants face a 3–6 year wait that no capital can compress.
CORRIDOR_CAP
Corridor Supply Constraint
The anchor hyperscaler campus will consume 300–400 MW at full build. Tier 2 and Tier 3 operators are actively seeking adjacent sites today. The corridor has a finite count of M-2 by-right sites with confirmed power. Supply is structurally constrained.
Adjacent comparable sites repriced 3–5× within 90 days of Q4-2023.
FIRST_MOVER
13-Month First-Mover Position
The Center was acquired, documented, and operationally stabilized before the corridor was publicly recognized. The 13-month detection lead cannot be replicated at any price. The acquisition was completed at standard industrial pricing with no corridor premium.
Detection: Q3-2022. First public announcement: Q4-2023.
ENGAGE_THE_PLATFORM
Your position in this corridor starts here.
The window to enter at this basis is open. Two paths depending on your role.
ACCREDITED_INVESTOR · CORRIDOR_POSITION
Request the full investor briefing.
CLARITY-02 memo. MAI appraisal. CPA-reviewed NOI. Lender-validated DSCR. 48-hr response.
24.5%
Base IRR
$12.0M
Appraised
95/100
MOAT Score
1.44×
DSCR
DC_OPERATOR · SITE_INTELLIGENCE
Submit your deployment requirements.
72-hr Shadow Power shortlist. 441-unit triage. Go/no-go per metro. Fixed-fee. 1 MW+ only.
72 hr
Go/No-Go
6–8 mo
Deploy Path
32+ MW
WI Headroom
$0.038
RTMP/kWh
1 The $61B+ corridor figure is the sum of separately announced capital commitments by multiple corporate entities across the greater Wisconsin/Racine region as reported in public press releases and state economic development filings from 2023–2025. This figure has not been independently verified or audited by Center Capital Collective and should not be treated as a single transaction or certified total.
Power rate figures: Racine RTMP rate based on PSCW tariff 5-UR-111 (confirmed). Comparator market rates (Chicago, Northern VA, Phoenix, Dallas) are published industry estimates and vary materially by contract structure, demand charge tier, and tariff conditions. Calculator output is illustrative only and does not constitute a financial commitment or advice. Actual power economics depend on negotiated rate structures.
Detection timeline is based on B2B Systems internal platform documentation. The 13-month detection lead and the 3–5× site repricing claim are company-reported figures derived from internal records and published market comparisons and have not been independently verified. All forward-looking statements, demand projections, and B2B target MW figures are estimates only and do not guarantee future results or returns. This page does not constitute an offer to sell or solicitation to buy any securities. Center Capital Collective offerings are available to verified accredited investors only under SEC Rule 506(c).
Questions? invest@center.capital · © 2026 The Center Capital Collective. All rights reserved.