PORTFOLIO_REGISTRY · CENTER_CAPITAL_COLLECTIVE · SS069

One verified asset.
Every number sourced.

The Center Capital Collective does not present hypothetical acquisitions. Every asset in this portfolio has been independently appraised, CPA-reviewed, lender-validated, and utility-confirmed before a single investor dollar is placed.

PORTFOLIO_COUNT

1

Active Asset

CURRENT_VALUE

$12.0M

MAI Appraised

NOI_FLOOR

$790K

Annual NOI

PLATFORM_SCORE

95/100

MOAT Score

FEATURED_ASSET · SS069 · ACTIVE

ASSET_ID · SS069 · CLARITY-02

1509 Rapids Drive, Racine, WI 53404

Former Hamilton Beach Manufacturing Campus · Data Center Conversion

ACTIVEVERIFIEDM-2 ZONE

VERIFIED_METRICS · ALL INDEPENDENTLY SOURCED

ACQUISITION

$3.1M

Acquisition Price

February 2023

MAI_APPRAISAL

$12.0M

MAI Appraised

Newmark · Jan 2025

NOI_ANNUAL

$790K

Annual NOI

CPA-reviewed

DSCR_PRE_DC

1.44×

DSCR Pre-DC

Lender validated

MOAT_SCORE

95/100

MOAT Score

#1 of 1,676 sites

PROFIT_MONTHS

36 mo

Consecutive Profit

No exception months

CAMPUS_SF

322K SF

Campus Size

18 buildings, 8+ acres

TENANTS

60+

Active Tenants

Self-storage & commercial

EXPANSION_ROADMAP · 5-PHASE BUILDOUT

Phase 1

Q3 2026

1.0 MW

ACTIVE

Phase 2

Q2 2027

2.5 MW

PLANNED

Phase 3

Q4 2027

4.0 MW

PLANNED

Phase 4

2028

6.0 MW

MODELED

Phase 5

2029+

10.0 MW

MODELED

FULL_ASSET_PROFILE · SS069 · 95-PAGE INSTITUTIONAL BRIEF AVAILABLE

Full Asset Profile

CORRIDOR_INTELLIGENCE · $61B+ COMMITTED

The Wisconsin data center corridor.

Five committed hyperscaler campuses within 55 miles of 1509 Rapids Drive. The Center detected this corridor in Q3-2022 — 13 months before any public announcement. SS069 is positioned 10 miles SE of the $20B anchor campus.

CAMPUS_01 · 10_MILES_SE

10 miles SE

Hyperscaler Campus (Mount Pleasant)

$20 Billion

Primary corridor anchor

CAMPUS_02 · 45_MILES_NE

45 miles NE

AI Infrastructure Campus (Port Washington)

$18 Billion

Hyperscale AI campus

CAMPUS_03 · 30_MILES_N

30 miles N

Regional Colo Hub (Milwaukee Metro)

$12 Billion

Regional colocation hub

CAMPUS_04 · 45_MILES_W

45 miles W

Hyperscale Campus (Janesville)

$10 Billion

Hyperscale campus

CAMPUS_05 · 55_MILES_NW

55 miles NW

AI/ML Infrastructure (Beaver Dam)

$1 Billion

AI/ML infrastructure

CORRIDOR_TOTAL · PUBLIC_ANNOUNCEMENTS_ONLY

$61B+ committed within 55 miles

Full Corridor Analysis

VERIFICATION_CHAIN · EVERY CLAIM INDEPENDENTLY SOURCED

Nothing self-reported.

Every metric on this page traces to an independent third-party source. Full documentation is available during due diligence. Nothing is hidden. Nothing is embellished.

MAI_APPRAISER

MAI-Certified Appraiser

Newmark · January 2025 · $12.0M independent valuation

INST_LENDER

Institutional Lender

1.44× DSCR pre-DC validated · LTV ~40% confirmed

CPA_REVIEWED

Licensed CPA

$790,216 annual NOI · 36 consecutive profitable months

UTILITY_CONFIRM

WE Energies

Form 4158 submitted · 32+ MW headroom confirmed

COUNTY_RECORDS

Racine County

M-2 Heavy Industrial zoning · No CUP required

FAA_CLEARANCE

FAA Clearance

ASRN 2025WI045 · Tower/antenna clearance on file

Full documentation available during due diligence. MAI appraisal, CPA financials, lender validation, utility letters, county records — all on file.

ACQUISITION_CRITERIA · 441-UNIT FRAMEWORK · NON-NEGOTIABLE

Every asset in this portfolio passed all 8 non-negotiable criteria.

From 1,676 nationally screened properties, SS069 scored #1 at 95/100. These are the floor thresholds — a site that fails any single criterion is disqualified before further analysis.

POWER_THRESHOLD

Available Power

32+ MW substation within 1 mile

FIBER_DENSITY

Fiber Access

4+ carriers within 800 feet

ZONING_CLASS

Zoning Classification

M-2 Industrial or equivalent

FLOOR_LOAD

Structural Rating

300+ PSF floor load capacity

CEILING_HEIGHT

Clear Height

20+ foot clear height minimum

MOAT_FLOOR

MOAT Score Floor

85+ required for consideration

ENVIRONMENTAL

Environmental

FEMA Flood Zone X, Seismic Zone 0

CORRIDOR_PREMIUM

Corridor Position

Within 60 miles of hyperscaler campus

View Full Platform Architecture

PIPELINE_REGISTRY · SCREENING_IN_PROGRESS

Future assets are already in the triage queue.

The 441-unit platform continuously screens the national database. Pipeline details remain confidential until verification is complete. Registered briefing attendees receive first access to new assets as they clear triage.

SITE_ALPHA

Pipeline Asset A

Midwest Industrial Corridor

SCREENING

441-unit triage in progress

SITE_BETA

Pipeline Asset B

Upper Midwest Fiber Hub

EVALUATING

Power confirmation pending

SITE_GAMMA

Pipeline Asset C

Secondary Hyperscaler Zone

MODELING

Financial model in development

Pipeline assets are disclosed to registered investors during the due diligence phase. Register for a briefing to receive early access.

INVESTOR_ACCESS · VERIFIED_ACCREDITED_ONLY

Every number on this page is verifiable. Bring your skepticism.

48-minute investor briefing. Live Q&A. Full documentation available during due diligence. 12% annually paid quarterly or 15% ROI at end of term. 60-Day Fit Guarantee.

Request a BriefingFull Asset Profile

Stewardship over speculation. People over profits. Christ at the center.

This page is for informational purposes only and does not constitute an offer to sell or solicitation to purchase any security. Investment opportunities are available only to verified accredited investors under SEC Regulation D Rule 506(c). Past performance is not indicative of future results. All projections are estimates and not guarantees. The $12.0M MAI-certified appraisal was conducted by Newmark in January 2025. $790,216 NOI is CPA-reviewed. DSCR validated by institutional lender. All documentation available during due diligence.

Questions? invest@center.capital  ·  © 2026 The Center Capital Collective. All rights reserved.